Riso 7010R Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Drukuj i skanuj Riso 7010R. ComColor SE Series Installation Procedure Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 4
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
8
52. Replace the Panel Unit (Bracket) with
three screws and close the Front Cover.
53. Secure the wire harness, which is
connected to the Panel Unit, with the
wire clamper.
Panel Bracket
Panel Unit
Wire clamper
59. Move down the adjusting bolt 1 until
the casters at both sides come away
from the  oor.
60. Move down the adjusting bolt 2 and 3
until they touch on the  oor, then fasten
them.
Note :
Secure the adjusting bolt 2 and 3, when
they slightly touch on the  oor.
61. Check the operation and the print
quality, then adjust settings.
Note :
Refer to the technical manual for
details.
Adjusting bolt
[Left side]
Caster
Caster
1
23
54. Replace the Top Cover; Right and Top
Cover; Le . (3 screws each)
55. Replace the Drainage Tank Cover.
(4 screws)
56. Affix the Emblem on the Front Left
Cover.
Important :
Clean up the attaching area with alchol
beforehand.
57. A x the Paper Size Label on the Front Tray.
(For 9050, 9050R, 7050, 7050R, 3050, 3050R)
Important :
Clean up the attaching area with alchol
beforehand.
Note :
Ask users which paper size they use and
a x labels.
58.
Secure the Manual Case. (Stepped screw
2pcs. included in the Control Card package)
Note :
Ask users if they need the Manual Case
or not.
Emblem
Manual Case
Top Cover Le
Top Cover; Right
Drainage Tank Cover
Paper Size Label
(For 9050, 9050R, 7050, 7050R, 3050, 3050R)
Panel Unit
1
Applicable Model
This document describes procedures for the
following models:
SE series
9050, 9050R
7050, 7050R, 3050, 3050R
7010, 7010R, 3010, 3010R
"SE series" is the model name of "ComColor".
ComColor Ink Cartride (Separately packaged)
1. ComColor Ink Cartridge (C) ....................... 1 pc.
2. ComColor Ink Cartridge (M) ...................... 1 pc.
3. ComColor Ink Cartridge (Y) ....................... 1 pc.
4. ComColor Ink Cartridge (K) .......................1 pc.
Control Card Kit (Separately packaged)
1. Control Card ................................................. 1 pc.
2. Emblem ......................................................... 1 pc.
3. User's Guide(E) ..........................................1 copy
4. Basic Guide(E) ............................................1 copy
5. Troubleshooting Guide(E) ........................1 copy
6. Administrator's Guide(E) ..........................1 copy
7. Printer Driver CD-ROM .............................. 1 pc.
8. User’s Guide CD-ROM .................................1 set
9. End User License Agreement ................... 1 sheet
10. Setting Procedure Manual ( is document) ....1 copy
11. Manual Case .................................................. 1 pc.
12. Stepped screw .............................................. 2 pcs.
13. F Label .......................................................1 sheet
When installing the printer and options at the
same time, check out options’ Setting Procedure
Manual before starting the installation. This
package may contain parts which are not
required for this installation. Some parts may be
required from another package.
Installation has to be done by an authorized technical expert.
Please read TECHNOCAL MANUAL of the applicable model about work precautions.
RISO Face Down Tray (Separately packaged)
1. Face Down Tray Assy ................................... 1 pc.
2. Face Down Bracket; F ................................... 1 pc.
3. Face Down Bracket; R ..................................1 pc.
4. Face Down Sub Fence; F...............................1 pc.
5. Face Down Sub Fence; R ..............................1 pc.
6. Screws ............................................................ 1 set
Top Cover; Le
Top Cover; Right
Drainage Tank Cover
1. Remove the tapes on the printer.
2. Remove the Top Cover; Right.
(3 screws)
3. Remove the Top Cover; Le .
(3 screws)
4. Remove the Drainage Tank Cover.
(4 screws)
5. Open the Front Cover.
Note :
Insert a metal ruler into the gap
between the Front Cover and move it
up to unlock.
For 9050,9050R,7050,7050R,3050
and 3050R, do not pull out the Front
Tray until the completion of the
procedure 10. (7010, 7010R, 3010
and 3010R do not have the Front
Front Tray
ComColor SE Series Installation Procedure
is package contains the following items.
ComColor SE Series Set
1.
ComColor SE series
..................................1 unit
2. Panel Unit ...................................................... 1 pc.
3. Bottom Cover ................................................ 1 pc.
4. Screws ............................................................ 1 set
5. Belt Platen Cleaning Stick ............................ 1 pc.
6. Drainage Tank Cap ....................................... 1 pc.
7. Safety Information .....................................1 copy
8. Image Sample ................................................ 1 set
9. Paper Size Label* ..................................... 3 sheets
10. Energy Star Label ......................................1 sheet
11. USB Caution Label ...................................1 sheet
12. Declaration of Conformity (For EU only)....1 sheet
13. FCC Declaration of Conformity ................ 1 sheet
14. Hinweis zu Gesetzen und Normen ............1 sheet
15. Out-of-Box Quality Check Sheet ...........1 sheet
Packing List
050-36037-506
*
is item is not included in 7010, 7010R, 3010 and 3010R.
10 mm (2/5 inch)
Metal ruler
Przeglądanie stron 0
1 2 3 4

Podsumowanie treści

Strona 1 - Packing List

852. Replace the Panel Unit (Bracket) with three screws and close the Front Cover. 53. Secure the wire harness, which is connected to the Panel Unit,

Strona 2

211. Remov e two Fi xed Shaf ts f rom the Belt Platen Unit at A as shown in the illustration.12. Secure the Fixed Shaft at B of the Frame. (IT M4x

Strona 3

634. Remove the USB Cover Label from the Panel Unit.35. Plug the wire harness into CN1, CN3, and CN5 on the PNL-CTL-PCB in the rear side of the Pane

Strona 4 - 7010, 7010R, 3010, 3010R

49050, 9050R, 7050, 7050R, 3050, 27. Remove the Shock Absorbing Block on the Drainage Tank.Shock Absorbing Block25. Secure the Bottom Cover. 9050, 90

Komentarze do niniejszej Instrukcji

Brak uwag